With sweat on my brow, I will paint the last stroke, hang the last curtain, and kiss this project goodbye. Time to pull out a bottle of wine and celebrate.
Yahoo!!! (Sorry Google)
This has been a long haul with such a busy summer.
These events happened but not necessarily in this order:
Built a vanity
Built a temporary Counter-Top
Poured a concrete Counter-top. Visit here to see the process.
Tiled a Bathtub (after we installed the darn thing, and built the walls for it...etc. etc.)
Built some more walls
Laid tubing in the floor for hot water heating.
Tiled a floor
Installed a light.
Installed a door.
Did a bit of wiring.
Plumbed
Tiled a back-splash for the sink and toilet
Hung new mirror!
Painted the New Mirror.
Made some fancy hand-towels for the Christmas season
Removed old electrical panel from house....completely! Yay
Built a tall cabinet to house the fan and also accommodate some bathroom storage.
And for all our hard work........
A little bit of encouragement for an organized 2013! |
Toilet Paper Bling! |
Poop Spray Bling! |
This photo is pre-Christmas. Beige curtain was still up. |
Tomorrow I will take some new pics and share!